The drawing shows the proposed plan and profile for the capital project at MM 182.8. This project has been proposed for a 319 Grant for restoration in 2008. |
Eagle River Watershed, Colorado
RiverRestoration.org is coordinating the design and implementation of sediment stabilization and removal projects in Black Gore Creek. These projects utilize new techniques and creative solutions for reducing the impact of sediment on the watershed such as sand wanding, geo-tubes and log cribbings. RiverRestoration.org identified potential projects outside of the highway corridor.
The left picture shows construction of a capital project in the Black Gore Creek channel complete in 2006. |
Highlights
- Designed Solutions to reduce Non-point source Sediment
- Prioritized Projects based on a cost/benefit analysis